CONSTRUCTION
PROGRESS
Ready for Phase II (and III)!
Phase I
construction, which includes the new church office, new restrooms, and
remodeled vestibule, was completed as May was drawing to a close. That means
that construction on the next phases will start up soon:
- Phase
II: May thru September – installation of the elevator and
construction of the second floor connector between the Parish House and
Education Building;
- Phase III:
June thru July - construction of the Education Building ramp and
moving doors.
Entry to the
Parish House and the Education Building will be restricted to specified
doorways. Signage will be posted to direct us all during the construction
time.
Hardhat
Area – This Means Us!
Before the construction phases
began we were all asked to go into work areas only when accompanied
by Bill Thompson, our Project Manager, or Charles Warren, our construction
representative. Building Committee members have emphasized that as we enter
the next phases of construction there will be a renewed possibility for
injury. Please Remember: Do not go into any of the
construction areas at any time of day or night unless accompanied by Bill
Thompson or Charles Warren.
Let’s Keep the
Momentum Over the Summer!
As reported at the March 29th
congregational meeting, the church has secured a three-year line of credit
for a maximum of $750,000 from NewAlliance Bank for the Welcoming All
project. Borrowing, as needed, will probably begin in June and will continue
during construction. Keeping up to date with your Welcoming All
pledge payments during the summer and fall will make a big difference
in reducing the amount we need to borrow and interest costs over the life of
the loan.
Haven’t Pledged or
Contributed to the Project Yet?
Our formal capital campaign is complete, but as we
begin to use our new welcoming entrance and restroom facilities we will
begin to “live” the vision of Welcoming All. Remember, new and
additional pledges and gifts are welcome at any time over the next three
years. You can contribute by requesting a pledge card or writing a check to
Storrs Congregational Church with “Welcoming All” on the memo line. Blue
Welcoming All offering envelopes are also available in the meeting house
and parish house lounge. If you’d like more information about how to support
the Welcoming All vision or about construction progress, contact the church
office at 860-429-9382.
Another
Look as the Vestibule and New Office Neared Completion
The photographs
below give a peek into the new vestibule and church office just days before
their completion at the end of May.
The door to the vestibule from
the parking area
and the new tiled floor are show in this photo. To the left -
windows to the church office. |

Another look at the
floor tile shows a glimpse of the hallway leading to the auditorium
stairs. Note the new electrical circuit box on the right. |

Shown here is the
doorway and windows to the new church office. A built-in countertop
can be see inside the new office. |

Another view of the
office windows ends our
“panoramic” look back at the vestibule entrance. |
|